{"id":19144,"date":"2024-02-11T03:34:41","date_gmt":"2024-02-11T03:34:41","guid":{"rendered":"https:\/\/pefaa.eng.pdn.ac.lk\/?page_id=19144"},"modified":"2025-05-10T04:55:09","modified_gmt":"2025-05-10T04:55:09","slug":"diamond-jubilee-projects","status":"publish","type":"page","link":"https:\/\/pefaa.eng.pdn.ac.lk\/index.php\/diamond-jubilee-projects\/","title":{"rendered":"Diamond Jubilee"},"content":{"rendered":"<p>[vc_row][vc_column]\r\n\t<div class=\"edukul-spacer clearfix\" data-desktop=\"30\" data-mobi=\"0\" data-smobi=\"0\"><\/div>[\/vc_column][\/vc_row][vc_section][vc_row][vc_column width=&#8221;1\/12&#8243;][\/vc_column][vc_column width=&#8221;5\/6&#8243;][vc_column_text]<\/p>\n<h2 style=\"text-align: center; color: white;\"><strong>Message from the Dean, Faculty of Engineering<\/strong><\/h2>\n<h4><\/h4>\n<h4 style=\"text-align: center;\">Request to support PEFAA initiatives to carry out a face-lifting of infrastructure at the Faculty to Celebrate Diamond Jubilee of the Faculty of Engineering, Peradeniya.<\/h4>\n<p>[\/vc_column_text][vc_column_text css=&#8221;.vc_custom_1720514651370{margin-right: 50px !important;margin-left: 50px !important;background-color: #ddaaaa !important;border-radius: 35px !important;}&#8221;]<\/p>\n<blockquote>\n<p style=\"text-align: justify;\"><strong><span style=\"color: #000000;\">As you are aware, the Faculty will celebrate its Diamond Jubilee on 1st July 2025. To emphasis this 75 Years of dedicated service to Engineering education of this country, series of activities starting from 1st July 2024 are being planned. The list of activities includes research symposium, promotional event at Techno 2024, activities at schools by present students, exhibition open to general public etc. It is envisaged that general public including senior engineers, administrative officers, foreign delegates, students from other universities and schools will visit the Faculty during this period.<\/span><\/strong><\/p>\n<p style=\"text-align: justify;\"><strong><span style=\"color: #000000;\">It was noted that the general appearance and some basic infrastructure facilities at the Faculty are not adequate to cater for such influx of people. Moreover, the batch size is now 455 and there are 5 batches physically at the Faculty during regular semester time. Considering all the above facts, it is imperative that a face lifting is given to the Faculty infrastructure prior to starting the Diamond Jubilee celebration related activities.<\/span><\/strong><\/p>\n<p style=\"text-align: justify;\"><strong><span style=\"color: #000000;\">I am happy to note that, after realizing the timely importance of this activity the Faculty and PEFAA have identified urgent and essential infrastructure improvements and upgrading required to improve the delivery of undergraduate study programs, after consulting all stake holders and prepared necessary reports\/ estimates etc.<\/span><\/strong><\/p>\n<p style=\"text-align: justify;\"><strong><span style=\"color: #000000;\">Accordingly, I kindly request all alumni groups to support its Alma Mater at this crucial time of economic downturn of the country, where no government funding is available for this type of work.<\/span><\/strong><\/p>\n<p style=\"text-align: justify;\"><strong><span style=\"color: #000000;\">Thanking you in advance.<\/span><\/strong><\/p>\n<p><strong>Dr. Udaya Dissanayake<\/strong><br \/>\n<strong>Dean\/ Faculty of Engineering<\/strong><\/p><\/blockquote>\n<p>[\/vc_column_text]\r\n\t<div class=\"edukul-spacer clearfix\" data-desktop=\"50\" data-mobi=\"50\" data-smobi=\"20\"><\/div><div class=\"edukul-divider divider-center divider-solid\" style=\"\"><\/div><div class=\"clearfix\"><\/div>\r\n\t<div class=\"edukul-spacer clearfix\" data-desktop=\"150\" data-mobi=\"100\" data-smobi=\"50\"><\/div>[vc_column_text]<\/p>\n<h2 style=\"text-align: center; color: white;\"><strong>Message from the President, PEFAA<\/strong><\/h2>\n<h4><\/h4>\n<h4 style=\"text-align: center;\">PEFAA needs the support of its MEMBERS to support the Faculty<\/h4>\n<p><!--more-->[\/vc_column_text][vc_column_text css=&#8221;.vc_custom_1731817684748{margin-right: 50px !important;margin-left: 50px !important;border-radius: 30px !important;}&#8221;]<\/p>\n<blockquote>\n<p style=\"text-align: justify;\"><strong><span style=\"color: #000000;\">As alumni of the Faculty of Engineering of the University of Peradeniya, we are sure that you all are looking for ways to give back to our beloved faculty and invest in the next generation. We have the perfect opportunity for you all !<\/span><\/strong><\/p>\n<p style=\"text-align: justify;\"><strong><span style=\"color: #000000;\">Over the past 31 years, PEFAA has done a yeoman service to the faculty with your support. With the Diamond Jubilee of Engineering Education in Sri Lanka scheduled for 1<sup>st<\/sup> July 2025 we are thrilled to make that event a success with whatever contributions we all can make.<\/span><\/strong><\/p>\n<p style=\"text-align: justify;\"><strong><span style=\"color: #000000;\">With the faculty staff members PEFAA has identified 75 projects for implementation and PEFAA is thankful to the past committees, Dean, Heads of Department, Faculty Academic staff members and especially Dr. Kamalanath Samarakoon for finalizing the project list seeking funds.<\/span><\/strong><\/p>\n<p style=\"text-align: justify;\"><strong><span style=\"color: #000000;\">PEFAA needs the support of its alumni to support the Faculty. Your donation would go toward uplifting the Faculty appearance and upgrading facilities in improving the undergraduate course delivery. Your donation will help us create a better learning environment where our students can thrive and reach their full potential. We understand the commitment this donation requires. However, every donation is an investment in the future of Engineering education at our faculty.<\/span><\/strong><\/p>\n<p style=\"text-align: justify;\"><strong><span style=\"color: #000000;\">We at PEFAA are looking for donations of all kinds: monetary, material and services. Every donation helps us reach our goal of providing the required educational experiences to our students. All donations are appreciated, and all donors will be recognized on our website and other social media. Any amount that you can donate will make an impact, no matter how large or small. Donations such as money, products and services are all useful to our cause. With your help, our students can look forward to having more resources while pursuing their dreams.<\/span><\/strong><\/p>\n<p style=\"text-align: justify;\"><strong><span style=\"color: #000000;\">The projects that require the support of the alumni is listed separately in the Newsletter, Web and other social media sites and we would appreciate if the batches or groups or individuals take up the projects. We are glad to announce that E74 Batch has agreed to take up 3 projects from the 2<sup>nd<\/sup> list of projects and many alumni have shown a keen interest to get involved.<\/span><\/strong><\/p>\n<p style=\"text-align: justify;\"><strong><span style=\"color: #000000;\">We appreciate your time and consideration, as together, we can make a difference in the future of our faculty. A dedicated bank account has been opened at Bank of Ceylon, University branch to receive the contributions and monthly income and expenses statements will be shared with our members to keep the process transparent.<\/span><\/strong><\/p>\n<p><span style=\"color: #800000;\"><strong>Bank Account Details are as follows; <\/strong><\/span><br \/>\n<span style=\"color: #800000;\"><strong>Name : Diamond Jubilee Fund<\/strong><\/span><br \/>\n<span style=\"color: #800000;\"><strong>Account No.: 92861593<\/strong><\/span><br \/>\n<span style=\"color: #800000;\"><strong>Bank : Bank of Ceylon 7010<\/strong><\/span><br \/>\n<span style=\"color: #800000;\"><strong>Branch : University of Peradeniya Branch 445<\/strong><\/span><br \/>\n<span style=\"color: #800000;\"><strong>Swift Code : BCEYLKLX<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><strong><span style=\"color: #000000;\">Please do not hesitate to reach out if you have any questions regarding this donation request!<\/span><\/strong><\/p>\n<p style=\"text-align: justify;\"><strong><span style=\"color: #000000;\">Thank you all in advance for your contributions.<\/span><\/strong><\/p>\n<p><strong>R Ravi Theaver <\/strong><br \/>\n<strong>President PEFAA \u2013 2023\/2024<\/strong><\/p><\/blockquote>\n<p>[\/vc_column_text]\r\n\t<div class=\"edukul-spacer clearfix\" data-desktop=\"50\" data-mobi=\"50\" data-smobi=\"20\"><\/div><div class=\"edukul-divider divider-center divider-solid\" style=\"\"><\/div><div class=\"clearfix\"><\/div>\r\n\t<div class=\"edukul-spacer clearfix\" data-desktop=\"150\" data-mobi=\"150\" data-smobi=\"50\"><\/div>[vc_single_image image=&#8221;19651&#8243; img_size=&#8221;500&#215;700&#8243; alignment=&#8221;center&#8221; style=&#8221;vc_box_rounded&#8221; onclick=&#8221;img_link_large&#8221;]\r\n\t<div class=\"edukul-spacer clearfix\" data-desktop=\"50\" data-mobi=\"20\" data-smobi=\"20\"><\/div>[\/vc_column][vc_column width=&#8221;1\/12&#8243;][\/vc_column][\/vc_row][\/vc_section][vc_row][vc_column width=&#8221;1\/12&#8243;][\/vc_column][vc_column width=&#8221;5\/6&#8243;][vc_column_text el_id=&#8221;DJubilee_Projects&#8221;][\/vc_column_text]\r\n\t<div class=\"edukul-spacer clearfix\" data-desktop=\"50\" data-mobi=\"50\" data-smobi=\"20\"><\/div>[vc_cta h2=&#8221;Thank you, esteemed Alumni of E62, E64, E66, E67, E70, E72, E73, E74, E75, E76, E77, E78, E80, E82, E83, E85, E86, E87, E89, E90, E93, E97, E98, E99, E03 and E08 Batches for generously agreeing to fund 48 impactful projects.&#8221; h4=&#8221;Congratulations !!! &#8211; Excelling together with Alma Mater, Your support is truly making a difference.&#8221; txt_align=&#8221;center&#8221; shape=&#8221;round&#8221; style=&#8221;outline&#8221; css=&#8221;.vc_custom_1746852748945{background-color: #eeee22 !important;border-radius: 10px !important;}&#8221;][\/vc_cta]\r\n\t<div class=\"edukul-spacer clearfix\" data-desktop=\"20\" data-mobi=\"20\" data-smobi=\"20\"><\/div><div class=\"edukul-headings clearfix text-center\"  style=\"\"><h2 class=\"heading clearfix \" style=\"color:#ffffff;\">\r\n\t\tLIST OF PROJECTS\r\n\t<\/h2><\/div>\r\n\t<div class=\"edukul-spacer clearfix\" data-desktop=\"50\" data-mobi=\"50\" data-smobi=\"20\"><\/div><div class=\"edukul-headings clearfix text-center\"  style=\"\"><h4 class=\"heading clearfix \" style=\"color:#eeee22;\">\r\n\t\t1. FACULTY FACELIFT PROJECTS\r\n\t<\/h4><div class=\"sep accent clearfix\" style=\"width:70px;height:2px;\"><\/div><p class=\"sub-heading clearfix\" style=\"font-style:normal;font-weight:400;color:#dd9933;font-size:20px;margin-top:20px;\">\r\n\t\tRs. 67.2 Millions\r\n\t<\/p><\/div>\r\n\t<div class=\"edukul-spacer clearfix\" data-desktop=\"20\" data-mobi=\"20\" data-smobi=\"0\"><\/div>[vc_cta h2=&#8221;Why do we need a FACELIFT for the Faculty?&#8221; h4=&#8221;See some recent photographs of the Faculty buildings showing the present conditions.&#8221; txt_align=&#8221;center&#8221; shape=&#8221;round&#8221; style=&#8221;outline&#8221; add_button=&#8221;right&#8221; btn_title=&#8221;Read More &#8230;&#8221; btn_style=&#8221;3d&#8221; btn_color=&#8221;warning&#8221; add_icon=&#8221;left&#8221; i_icon_fontawesome=&#8221;fas fa-info-circle&#8221; i_background_style=&#8221;rounded-outline&#8221; btn_link=&#8221;url:https%3A%2F%2Fpefaa.eng.pdn.ac.lk%2Fwp-content%2Fuploads%2F2024%2F05%2FPEFAA-PHOTO-EVIDANCE-FOR-SEEKING-FUNDS.pdf|target:_blank&#8221; css=&#8221;.vc_custom_1717129043580{background-color: #eded76 !important;}&#8221;][\/vc_cta]\r\n\t<div class=\"edukul-spacer clearfix\" data-desktop=\"20\" data-mobi=\"0\" data-smobi=\"0\"><\/div>\n<table id=\"tablepress-4\" class=\"tablepress tablepress-id-4\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\"><strong>No<\/strong><\/th><th class=\"column-2\"><strong>Project Title<\/strong><\/th><th class=\"column-3\"><strong>Cost (Rs. Millions)<\/strong><\/th><th class=\"column-4\"><strong>Taken By<\/strong><\/th><th class=\"column-5\">Progress (%)<\/th>\n<\/tr>\n<\/thead>\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-2\">\n\t<td class=\"column-1\">1<\/td><td class=\"column-2\">Painting - Administration Building External<\/td><td class=\"column-3\">3.2<\/td><td class=\"column-4\"><strong>E82 Batch<\/strong><\/td><td class=\"column-5\">80<\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">2<\/td><td class=\"column-2\">Painting - Administration Building internal<\/td><td class=\"column-3\">6.6<\/td><td class=\"column-4\"><strong>E82 Batch<\/strong><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">3<\/td><td class=\"column-2\">Painting - EOE Pereira Theatre<\/td><td class=\"column-3\">1.3<\/td><td class=\"column-4\"><strong>E66 Batch<\/strong><\/td><td class=\"column-5\">100<\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\">4<\/td><td class=\"column-2\">Painting - Drawing Office 01<\/td><td class=\"column-3\">1.8<\/td><td class=\"column-4\"><\/td><td class=\"column-5\">15<\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\">5<\/td><td class=\"column-2\">Painting - Drawing Office 02<\/td><td class=\"column-3\">2.7<\/td><td class=\"column-4\"><\/td><td class=\"column-5\">15<\/td>\n<\/tr>\n<tr class=\"row-7\">\n\t<td class=\"column-1\">6<\/td><td class=\"column-2\">Painting - Material Lab<\/td><td class=\"column-3\">1.4<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-8\">\n\t<td class=\"column-1\">7<\/td><td class=\"column-2\">Painting - Survey Lab<\/td><td class=\"column-3\">1.2<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-9\">\n\t<td class=\"column-1\">8<\/td><td class=\"column-2\">Painting - Fluid Lab<\/td><td class=\"column-3\">1.2<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-10\">\n\t<td class=\"column-1\">9<\/td><td class=\"column-2\">Painting - Thermodynamics Lab<\/td><td class=\"column-3\">1.4<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-11\">\n\t<td class=\"column-1\">10<\/td><td class=\"column-2\">Painting - Engineering Workshop<\/td><td class=\"column-3\">2.5<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-12\">\n\t<td class=\"column-1\">11<\/td><td class=\"column-2\">Painting - Structure Lab<\/td><td class=\"column-3\">1.5<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-13\">\n\t<td class=\"column-1\">12<\/td><td class=\"column-2\">Painting - Lecture room 02 and 03 - External<\/td><td class=\"column-3\">0.9<\/td><td class=\"column-4\"><strong>E98 Batch<\/strong><\/td><td class=\"column-5\">100<\/td>\n<\/tr>\n<tr class=\"row-14\">\n\t<td class=\"column-1\">13<\/td><td class=\"column-2\">Painting - Corridor<\/td><td class=\"column-3\">5.8<\/td><td class=\"column-4\"><strong>E03 Batch<\/strong><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-15\">\n\t<td class=\"column-1\">14<\/td><td class=\"column-2\">--<\/td><td class=\"column-3\">--<\/td><td class=\"column-4\">--<\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-16\">\n\t<td class=\"column-1\">15<\/td><td class=\"column-2\">Painting - Engineering Library External\/Valance Board\/Gutters\/Down pipes<\/td><td class=\"column-3\">2.3<\/td><td class=\"column-4\"><strong>E72 Batch<\/strong><\/td><td class=\"column-5\">99<\/td>\n<\/tr>\n<tr class=\"row-17\">\n\t<td class=\"column-1\">16<\/td><td class=\"column-2\">Painting - Generator room<\/td><td class=\"column-3\">0.3<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-18\">\n\t<td class=\"column-1\">17<\/td><td class=\"column-2\">Painting - High Voltage Lab<\/td><td class=\"column-3\">0.6<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-19\">\n\t<td class=\"column-1\">18<\/td><td class=\"column-2\">Painting - Electrical &amp; Electronic Workshop<\/td><td class=\"column-3\">0.5<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-20\">\n\t<td class=\"column-1\">19<\/td><td class=\"column-2\">Painting - Environmental Lab<\/td><td class=\"column-3\">0.4<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-21\">\n\t<td class=\"column-1\">20<\/td><td class=\"column-2\">Painting - Manufacturing Department<\/td><td class=\"column-3\">0.5<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-22\">\n\t<td class=\"column-1\">21<\/td><td class=\"column-2\">Painting - Applied Mechanics Lab<\/td><td class=\"column-3\">1.2<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-23\">\n\t<td class=\"column-1\">22<\/td><td class=\"column-2\">Painting - Engineering Library Internal\/Window Repairs\/ Coilling repairs and Painting<\/td><td class=\"column-3\">1<\/td><td class=\"column-4\"><strong>E72 Batch<\/strong><\/td><td class=\"column-5\">100<\/td>\n<\/tr>\n<tr class=\"row-24\">\n\t<td class=\"column-1\">23<\/td><td class=\"column-2\">Painting - Civil Office<\/td><td class=\"column-3\">0.2<\/td><td class=\"column-4\"><strong>E99 Batch<\/strong><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-25\">\n\t<td class=\"column-1\">24<\/td><td class=\"column-2\">Painting - Chemical &amp; Process Engineering Lab<\/td><td class=\"column-3\">1.8<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-26\">\n\t<td class=\"column-1\">25<\/td><td class=\"column-2\">Painting - Maths Department<\/td><td class=\"column-3\">3.4<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-27\">\n\t<td class=\"column-1\">26<\/td><td class=\"column-2\">Painting - Computer Engineering<\/td><td class=\"column-3\">1.2<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-28\">\n\t<td class=\"column-1\">27<\/td><td class=\"column-2\">Painting - New Mechanics Lab<\/td><td class=\"column-3\">1.6<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-29\">\n\t<td class=\"column-1\">28<\/td><td class=\"column-2\">Painting - Electronic Lab<\/td><td class=\"column-3\">1<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-30\">\n\t<td class=\"column-1\">29<\/td><td class=\"column-2\">Painting - Washroom (External)<\/td><td class=\"column-3\">0.3<\/td><td class=\"column-4\"><strong>E08 Batch<\/strong><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-31\">\n\t<td class=\"column-1\">30<\/td><td class=\"column-2\">Repairing - Drain and Drain Covers<\/td><td class=\"column-3\">0.4<\/td><td class=\"column-4\"><strong>E76 Batch<\/strong><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-32\">\n\t<td class=\"column-1\">31<\/td><td class=\"column-2\">Repairing - Valance Boards<\/td><td class=\"column-3\">0.3<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-33\">\n\t<td class=\"column-1\">32-1<\/td><td class=\"column-2\">Repairing - Main Corridor Slabs Expansion Joints and water proofing<\/td><td class=\"column-3\">1.0<\/td><td class=\"column-4\"><strong>E76 Batch<\/strong> (Water proofing-part 1)<\/td><td class=\"column-5\">5<\/td>\n<\/tr>\n<tr class=\"row-34\">\n\t<td class=\"column-1\">32-2<\/td><td class=\"column-2\">Repairing - Main Corridor Slabs Expansion Joints and water proofing<\/td><td class=\"column-3\">1.1<\/td><td class=\"column-4\"><strong>E83 Batch<\/strong><\/td><td class=\"column-5\">5<\/td>\n<\/tr>\n<tr class=\"row-35\">\n\t<td class=\"column-1\">33<\/td><td class=\"column-2\">Repairing - Other Corridor Slabs Expansion Joints and water proofing<\/td><td class=\"column-3\">4<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-36\">\n\t<td class=\"column-1\">34<\/td><td class=\"column-2\">Renovation of Female toilets- Manufacturing 01\/DOI-01<\/td><td class=\"column-3\">3<\/td><td class=\"column-4\"><strong>E85 Batch<\/strong><\/td><td class=\"column-5\">80<\/td>\n<\/tr>\n<tr class=\"row-37\">\n\t<td class=\"column-1\">35<\/td><td class=\"column-2\"><em><strong>Renovation of Male Toilets<\/strong><\/em><\/td><td class=\"column-3\">-<\/td><td class=\"column-4\">-<\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-38\">\n\t<td class=\"column-1\">35-1<\/td><td class=\"column-2\">Washroom #1 (Library)<\/td><td class=\"column-3\">1.5<\/td><td class=\"column-4\"><strong>E86 Batch<\/strong><\/td><td class=\"column-5\">10<\/td>\n<\/tr>\n<tr class=\"row-39\">\n\t<td class=\"column-1\">35-2<\/td><td class=\"column-2\">Washroom #2 (DO-II)<\/td><td class=\"column-3\">1.3<\/td><td class=\"column-4\"><strong>E87 Batch<\/strong><\/td><td class=\"column-5\">10<\/td>\n<\/tr>\n<tr class=\"row-40\">\n\t<td class=\"column-1\">35-3<\/td><td class=\"column-2\">Washroom #3 (DO-II)<\/td><td class=\"column-3\">1.4<\/td><td class=\"column-4\"><strong>E76 Batch<\/strong><\/td><td class=\"column-5\">10<\/td>\n<\/tr>\n<tr class=\"row-41\">\n\t<td class=\"column-1\">35-4<\/td><td class=\"column-2\">Washroom #4 (LR 09)<\/td><td class=\"column-3\">1.4<\/td><td class=\"column-4\"><strong>E76 Batch<\/strong><\/td><td class=\"column-5\">90<\/td>\n<\/tr>\n<tr class=\"row-42\">\n\t<td class=\"column-1\">35-5<\/td><td class=\"column-2\">Hand Cleaning Equipment<\/td><td class=\"column-3\">0.4<\/td><td class=\"column-4\"><strong>E76 Batch<\/strong><\/td><td class=\"column-5\">75<\/td>\n<\/tr>\n<tr class=\"row-43\">\n\t<td class=\"column-1\">36<\/td><td class=\"column-2\">Repairing - Other minor repairs and electrical works<\/td><td class=\"column-3\">2<\/td><td class=\"column-4\"><strong>LTL <\/strong><\/td><td class=\"column-5\">5<\/td>\n<\/tr>\n<tr class=\"row-44\">\n\t<td class=\"column-1\">37<\/td><td class=\"column-2\">Quality Controlling &amp; QC staffing Cost ( Engineer &amp; Supervisor)<\/td><td class=\"column-3\">1.5<\/td><td class=\"column-4\"><strong>Sponsored<\/strong><em><\/td><td class=\"column-5\">100<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<!-- #tablepress-4 from cache -->\r\n\t<div class=\"edukul-spacer clearfix\" data-desktop=\"50\" data-mobi=\"50\" data-smobi=\"20\"><\/div><div class=\"edukul-headings clearfix text-center\"  style=\"\"><h4 class=\"heading clearfix \" style=\"color:#eeee22;\">\r\n\t\t2. LEARNING PROCESS IMPROVEMENT PROJECTS\r\n\t<\/h4><div class=\"sep accent clearfix\" style=\"width:70px;height:2px;\"><\/div><p class=\"sub-heading clearfix\" style=\"font-style:normal;color:#dd9933;font-size:20px;margin-top:20px;\">\r\n\t\tRs. 194.3 Millions\r\n\t<\/p><\/div>\r\n\t<div class=\"edukul-spacer clearfix\" data-desktop=\"20\" data-mobi=\"20\" data-smobi=\"20\"><\/div>\n<table id=\"tablepress-1\" class=\"tablepress tablepress-id-1\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\"><strong>No<\/strong><\/th><th class=\"column-2\"><strong>Department<\/strong><\/th><th class=\"column-3\"><strong>Project Title<\/strong><\/th><th class=\"column-4\"><strong>Cost (Rs. Millions)<\/strong><\/th><th class=\"column-5\"><strong>Taken By<\/strong><\/th><th class=\"column-6\"><strong>Progress (%)<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-2\">\n\t<td class=\"column-1\">1<\/td><td class=\"column-2\">Common<\/td><td class=\"column-3\">Establishing a smart lecture room for recording lecturers to produce recorded teaching materials for the use of all lecturers of the Faculty<a href=\"https:\/\/drive.google.com\/file\/d\/1xSMJazMjcbUQTOnz53EAlNxtYbcl7LIO\/view?usp=drive_link\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">10.0<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">2-1<\/td><td class=\"column-2\">Common<\/td><td class=\"column-3\">Update 11 lecture rooms with state of art equipment -<br \/>\nHall Nos. 2 &amp; 3 <\/td><td class=\"column-4\">4.0<\/td><td class=\"column-5\"><strong>E78 Batch (1.5 Mn)<\/strong><\/td><td class=\"column-6\">100<\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">2-2<\/td><td class=\"column-2\"><\/td><td class=\"column-3\"> Update 11 lecture rooms with state of art equipment -<br \/>\nHall No.7<\/td><td class=\"column-4\">1.3<\/td><td class=\"column-5\"><strong>E80 Batch<\/strong><\/td><td class=\"column-6\">40<\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\">2-3<\/td><td class=\"column-2\"><\/td><td class=\"column-3\">Update 11 lecture rooms with state of art equipment -Hall No.8<\/td><td class=\"column-4\">2.0<\/td><td class=\"column-5\"><strong>E97 Batch (2.1Mn)<\/strong><\/td><td class=\"column-6\">40<\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\">2-4<\/td><td class=\"column-2\"><\/td><td class=\"column-3\">Update 11 lecture rooms with state of art equipment -Hall 09 &amp; Room 17<\/td><td class=\"column-4\">2.0<\/td><td class=\"column-5\"><strong>E77 Batch<\/strong><\/td><td class=\"column-6\">10<\/td>\n<\/tr>\n<tr class=\"row-7\">\n\t<td class=\"column-1\">2-5<\/td><td class=\"column-2\"><\/td><td class=\"column-3\">Update 11 lecture rooms with state of art equipment -Hall No 10 &amp; 11<\/td><td class=\"column-4\">2.0<\/td><td class=\"column-5\"><strong>E78 Batch (2.2Mn)<\/strong><\/td><td class=\"column-6\">99<\/td>\n<\/tr>\n<tr class=\"row-8\">\n\t<td class=\"column-1\">2-6<\/td><td class=\"column-2\"><\/td><td class=\"column-3\">Update 11 lecture rooms with state of art equipment<\/td><td class=\"column-4\">1.0<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td>\n<\/tr>\n<tr class=\"row-9\">\n\t<td class=\"column-1\">2-7<\/td><td class=\"column-2\"><\/td><td class=\"column-3\">New Project - WIFI coverage equipments <\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><strong>E67 Batch (5Mn)<\/strong><\/td><td class=\"column-6\"><\/td>\n<\/tr>\n<tr class=\"row-10\">\n\t<td class=\"column-1\">3<\/td><td class=\"column-2\">Common<\/td><td class=\"column-3\">Upgrading 9 lecture Rooms at Drawing Office 01 Ground Floor<\/td><td class=\"column-4\">5.0<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td>\n<\/tr>\n<tr class=\"row-11\">\n\t<td class=\"column-1\">4<\/td><td class=\"column-2\">Common<\/td><td class=\"column-3\">24\/7 e-access facility for upeer floor rooms at library premises<\/td><td class=\"column-4\">1.5<\/td><td class=\"column-5\"><strong>E64 Batch<\/strong><\/td><td class=\"column-6\">5<\/td>\n<\/tr>\n<tr class=\"row-12\">\n\t<td class=\"column-1\">5<\/td><td class=\"column-2\">Common<\/td><td class=\"column-3\">Discussion chamber at Library<\/td><td class=\"column-4\">2.0<\/td><td class=\"column-5\"><strong>E72 Batch<\/strong><\/td><td class=\"column-6\">5<\/td>\n<\/tr>\n<tr class=\"row-13\">\n\t<td class=\"column-1\">6<\/td><td class=\"column-2\">Common<\/td><td class=\"column-3\">Visitor lounge at the admin building<\/td><td class=\"column-4\">0.5<\/td><td class=\"column-5\"><strong>E82 Batch<\/strong><\/td><td class=\"column-6\"><\/td>\n<\/tr>\n<tr class=\"row-14\">\n\t<td class=\"column-1\">7<\/td><td class=\"column-2\">Common<\/td><td class=\"column-3\">Washroom  for visitors at the admin building<\/td><td class=\"column-4\">0.8<\/td><td class=\"column-5\"><strong>E82 Batch<\/strong><\/td><td class=\"column-6\"><\/td>\n<\/tr>\n<tr class=\"row-15\">\n\t<td class=\"column-1\">8<\/td><td class=\"column-2\">Common<\/td><td class=\"column-3\">Upholster Department Furniture<\/td><td class=\"column-4\">0.3<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td>\n<\/tr>\n<tr class=\"row-16\">\n\t<td class=\"column-1\">9<\/td><td class=\"column-2\">Common<\/td><td class=\"column-3\">Pera Ride Automated Bicycle Sharing System<a href=\"https:\/\/drive.google.com\/file\/d\/175Kupq-uRp5ymWpqNkViCffSCyZMKpgX\/view?usp=drive_link\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">1.0<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td>\n<\/tr>\n<tr class=\"row-17\">\n\t<td class=\"column-1\">10<\/td><td class=\"column-2\">Common<\/td><td class=\"column-3\">Dust Extracters for Lecture Rooms- vacuum cleaner<\/td><td class=\"column-4\">1.0<\/td><td class=\"column-5\"><strong>Eng. Y.K.A. Yapa of E72 Batch<\/strong><\/td><td class=\"column-6\"><\/td>\n<\/tr>\n<tr class=\"row-18\">\n\t<td class=\"column-1\">11<\/td><td class=\"column-2\">Chemical<\/td><td class=\"column-3\">Multifunctional Learning and Teaching Facility for 50 students<a href=\"https:\/\/drive.google.com\/file\/d\/17-CaNRsPiuptRr58SGBlbR6e7SN1tMSq\/view?usp=drive_link\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">3.9<\/td><td class=\"column-5\"><strong>E74 Batch<\/strong><\/td><td class=\"column-6\">100<\/td>\n<\/tr>\n<tr class=\"row-19\">\n\t<td class=\"column-1\">12<\/td><td class=\"column-2\">Computer<\/td><td class=\"column-3\">Computer vision and Artificial Intelligence Lab<a href=\"https:\/\/docs.google.com\/document\/d\/18-kmYEh_3H4A-gYT8NNCGyiGo82TCRYg\/edit?usp=drive_link&amp;ouid=111083391598623951171&amp;rtpof=true&amp;sd=true\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">13.5<\/td><td class=\"column-5\"><strong>LTL<\/strong><\/td><td class=\"column-6\">30<\/td>\n<\/tr>\n<tr class=\"row-20\">\n\t<td class=\"column-1\">13<\/td><td class=\"column-2\">Computer<\/td><td class=\"column-3\">Install a lift for 5 storied computer engineering building to allow physically impaired students to attend classes and laboratories<a href=\"https:\/\/drive.google.com\/file\/d\/1xxpbOyG2_nUjBdyA0NUQ6Fou_ar4xZmG\/view?usp=drive_link\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">9.5<\/td><td class=\"column-5\"><strong>E70 Batch<\/strong><\/td><td class=\"column-6\">40<\/td>\n<\/tr>\n<tr class=\"row-21\">\n\t<td class=\"column-1\">14<\/td><td class=\"column-2\">Computer<\/td><td class=\"column-3\">Emergency Fire Exit for the 5 storied computer engineering building<a href=\"https:\/\/drive.google.com\/file\/d\/1z279zxs14j_L3vWQgO_0GN-C0ChXhLtB\/view?usp=drive_link\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">1.5<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td>\n<\/tr>\n<tr class=\"row-22\">\n\t<td class=\"column-1\">15<\/td><td class=\"column-2\">Computer<\/td><td class=\"column-3\">Open Lab for students to work 24x7 <a href=\"https:\/\/docs.google.com\/document\/d\/1YxHB8RQFgIoy2mY5CYkAPWEXi_FuQpLJ\/edit?usp=drive_link&amp;ouid=111083391598623951171&amp;rtpof=true&amp;sd=true\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">4.0<\/td><td class=\"column-5\"><strong>Eng. Lanka Shantha (E75), Sunil (E74) , Jagath (E75)<\/strong><\/td><td class=\"column-6\">25<\/td>\n<\/tr>\n<tr class=\"row-23\">\n\t<td class=\"column-1\">16<\/td><td class=\"column-2\">Electrical<\/td><td class=\"column-3\">Development of Robot City and Intelligence Laboratory<a href=\"https:\/\/drive.google.com\/file\/d\/1JXDORVWBWTjia2SvO25Su7HejSiUu0O0\/view?usp=drive_link\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">1.0<\/td><td class=\"column-5\"><strong>E74 Batch<\/strong><\/td><td class=\"column-6\">10<\/td>\n<\/tr>\n<tr class=\"row-24\">\n\t<td class=\"column-1\">17<\/td><td class=\"column-2\">Electrical<\/td><td class=\"column-3\">Establishing a state of the art (SCADA) Lab<a href=\"https:\/\/drive.google.com\/file\/d\/1wxEs_BIoPFQLDRgHGQ1n__FiiO3dqJos\/view?usp=drive_link\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">7.0<\/td><td class=\"column-5\"><strong>E62 Batch<\/strong><\/td><td class=\"column-6\">15<\/td>\n<\/tr>\n<tr class=\"row-25\">\n\t<td class=\"column-1\">18<\/td><td class=\"column-2\">Electrical<\/td><td class=\"column-3\">Electronic Equipment for Project Area<a href=\"https:\/\/drive.google.com\/file\/d\/1Mi7E_vMJyOPQYtfgwGE-j1pne_UggwYG\/view?usp=drive_link\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">2.8<\/td><td class=\"column-5\"><strong>E78 Batch (5Mn)<\/strong><\/td><td class=\"column-6\">100<\/td>\n<\/tr>\n<tr class=\"row-26\">\n\t<td class=\"column-1\">19<\/td><td class=\"column-2\">Electrical<\/td><td class=\"column-3\">Interior Design &amp; Furnishing Entrance<a href=\"https:\/\/drive.google.com\/file\/d\/1SQHxxu-2U9_VqPK1xkfVa6EdFSi08Ipx\/view?usp=drive_link\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">5.0<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td>\n<\/tr>\n<tr class=\"row-27\">\n\t<td class=\"column-1\">20<\/td><td class=\"column-2\">Mechanical<\/td><td class=\"column-3\">Air conditioned  enclosure for  the  CNC machine<a href=\"https:\/\/docs.google.com\/document\/d\/1n1Sk9XVcLqTx1On3cx5JObxSfq6aznQF\/edit?usp=drive_link&amp;ouid=111083391598623951171&amp;rtpof=true&amp;sd=true\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">0.7<\/td><td class=\"column-5\"><strong>E99 Batch<\/strong><\/td><td class=\"column-6\">5<\/td>\n<\/tr>\n<tr class=\"row-28\">\n\t<td class=\"column-1\">21<\/td><td class=\"column-2\">Mechanical<\/td><td class=\"column-3\">Multimedia  Projectors for  Drawing  Office  1 (DOI)<\/td><td class=\"column-4\">0.6<\/td><td class=\"column-5\"><strong>E78 Batch (1.4Mn)<\/strong><\/td><td class=\"column-6\">100<\/td>\n<\/tr>\n<tr class=\"row-29\">\n\t<td class=\"column-1\">22<\/td><td class=\"column-2\">Mechanical<\/td><td class=\"column-3\">Renovation of the floor in the Applied Thermodynamics Lab<a href=\"https:\/\/docs.google.com\/document\/d\/123ttTlF1evGlHsy9yuauGuTvXtUfdds9\/edit?usp=drive_link&amp;ouid=111083391598623951171&amp;rtpof=true&amp;sd=true\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">4.0<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td>\n<\/tr>\n<tr class=\"row-30\">\n\t<td class=\"column-1\">23<\/td><td class=\"column-2\">Manufacturing<\/td><td class=\"column-3\">Restoring \/repairing the existing Hardware for Research work<a href=\"https:\/\/drive.google.com\/file\/d\/1XfPHrAA0a3Fc27E9vY2lmpJf2VSu9S4F\/view?usp=sharing\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">1.2<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td>\n<\/tr>\n<tr class=\"row-31\">\n\t<td class=\"column-1\">24<\/td><td class=\"column-2\">Manufacturing<\/td><td class=\"column-3\">The functioning of Industrial Robotics lab<a href=\"https:\/\/drive.google.com\/file\/d\/14jxCJhtU48jCN-lJURiqIWvd_t6ffgDj\/view?usp=sharing\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">1.2<\/td><td class=\"column-5\"><strong>E89 Batch<\/strong><\/td><td class=\"column-6\">100<\/td>\n<\/tr>\n<tr class=\"row-32\">\n\t<td class=\"column-1\">25<\/td><td class=\"column-2\">Manufacturing<\/td><td class=\"column-3\">Funding Mechanism  to undergraduate Projects\/Research<a href=\"https:\/\/drive.google.com\/file\/d\/1ZHAF0GwLE5E77HTFEHSgFXNU4mgKjWnL\/view?usp=sharing\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">0.4<\/td><td class=\"column-5\"><strong>E99 Batch<\/strong><\/td><td class=\"column-6\">5<\/td>\n<\/tr>\n<tr class=\"row-33\">\n\t<td class=\"column-1\">26<\/td><td class=\"column-2\">Manufacturing<\/td><td class=\"column-3\">Improvement of Teaching-Learning Environment<a href=\"https:\/\/drive.google.com\/file\/d\/14UJHUAolCBQIuAsp7IqW-kulzCg6umjr\/view?usp=sharing\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">1.0<\/td><td class=\"column-5\"><strong>E90 Batch<\/strong><\/td><td class=\"column-6\">5<\/td>\n<\/tr>\n<tr class=\"row-34\">\n\t<td class=\"column-1\">27<\/td><td class=\"column-2\">Manufacturing<\/td><td class=\"column-3\">Water Proofing and Sealing of Water leak at Basement<a href=\"https:\/\/drive.google.com\/file\/d\/14UT6_l5qKBS03fH6AniSHnQADMBGIseg\/view?usp=sharing\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">16.0<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td>\n<\/tr>\n<tr class=\"row-35\">\n\t<td class=\"column-1\">28<\/td><td class=\"column-2\">Civil<\/td><td class=\"column-3\">Upgrading CAD Lab:  2 workstations Stage1<a href=\"https:\/\/drive.google.com\/file\/d\/1ZUx3reolANZRKci59htDh2V4_kkwjP1K\/view?usp=drive_link\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">5.0<\/td><td class=\"column-5\"><strong>E73 Batch<\/strong> (3.1 M), <strong>E75 Batch <\/strong>(2.2 M)<\/td><td class=\"column-6\">100<\/td>\n<\/tr>\n<tr class=\"row-36\">\n\t<td class=\"column-1\">29<\/td><td class=\"column-2\">Civil<\/td><td class=\"column-3\">Simulation Server for CAD Lab Stage 2<a href=\"https:\/\/drive.google.com\/file\/d\/1ZUx3reolANZRKci59htDh2V4_kkwjP1K\/view?usp=drive_link\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">13.0<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td>\n<\/tr>\n<tr class=\"row-37\">\n\t<td class=\"column-1\">30<\/td><td class=\"column-2\">Civil<\/td><td class=\"column-3\">Transportation and Simulation Lab<a href=\"https:\/\/drive.google.com\/file\/d\/1ZpwbbADXQgyYBwviSEZ2jggmQYIpVbki\/view?usp=drive_link\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">2.0<\/td><td class=\"column-5\"><strong>E90 Batch<\/strong><em><\/td><td class=\"column-6\"><\/td>\n<\/tr>\n<tr class=\"row-38\">\n\t<td class=\"column-1\">31<\/td><td class=\"column-2\">Comp. Center<\/td><td class=\"column-3\">Providing 50 Computers 2024<a href=\"https:\/\/drive.google.com\/file\/d\/1Lyd8-y0X2uPSFtFBjnuBZbFq9GwEIqZ8\/view?usp=drive_link\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">15.0<\/td><td class=\"column-5\"><strong>E89 Batch<\/strong> (6 computers 1.8 M) <strong>E75 Batch<\/strong> (6 computers 1.8 M)<\/td><td class=\"column-6\">20<\/td>\n<\/tr>\n<tr class=\"row-39\">\n\t<td class=\"column-1\">32<\/td><td class=\"column-2\">Comp. Center<\/td><td class=\"column-3\">Providing 50 Computers 2025<a href=\"https:\/\/drive.google.com\/file\/d\/1Lyd8-y0X2uPSFtFBjnuBZbFq9GwEIqZ8\/view?usp=drive_link\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">15.0<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td>\n<\/tr>\n<tr class=\"row-40\">\n\t<td class=\"column-1\">33<\/td><td class=\"column-2\">Comp. Center<\/td><td class=\"column-3\">Providing 50 Computers 2026<a href=\"https:\/\/drive.google.com\/file\/d\/1Lyd8-y0X2uPSFtFBjnuBZbFq9GwEIqZ8\/view?usp=drive_link\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">15.0<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td>\n<\/tr>\n<tr class=\"row-41\">\n\t<td class=\"column-1\">34<\/td><td class=\"column-2\">Comp. Center<\/td><td class=\"column-3\">Providing 50 Computers 2027<a href=\"https:\/\/drive.google.com\/file\/d\/1Lyd8-y0X2uPSFtFBjnuBZbFq9GwEIqZ8\/view?usp=drive_link\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">15.0<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td>\n<\/tr>\n<tr class=\"row-42\">\n\t<td class=\"column-1\">35<\/td><td class=\"column-2\">Ind. Training<\/td><td class=\"column-3\">Upgrading the common room at ITCGU<a href=\"https:\/\/docs.google.com\/document\/d\/1Z5lJhacSzCJQejnfpbmjQqDsVpckbwfr\/edit?usp=drive_link&amp;ouid=111083391598623951171&amp;rtpof=true&amp;sd=true\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">0.9<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td>\n<\/tr>\n<tr class=\"row-43\">\n\t<td class=\"column-1\">36<\/td><td class=\"column-2\">Ind. Training<\/td><td class=\"column-3\">IPads for mentoring and assessing students<a href=\"https:\/\/docs.google.com\/document\/d\/1Z5lJhacSzCJQejnfpbmjQqDsVpckbwfr\/edit?usp=drive_link&amp;ouid=111083391598623951171&amp;rtpof=true&amp;sd=true\" rel=\"noopener\" target=\"_blank\"> (<strong>Read More<\/strong>)<\/a><\/td><td class=\"column-4\">0.7<\/td><td class=\"column-5\"><strong>E90 Batch<\/strong><\/td><td class=\"column-6\">100<\/td>\n<\/tr>\n<tr class=\"row-44\">\n\t<td class=\"column-1\">37<\/td><td class=\"column-2\">Mechanical<\/td><td class=\"column-3\">Extention of Computer centre of Thermodynamics lab<\/td><td class=\"column-4\">0.4<\/td><td class=\"column-5\"><strong>E86 Batch (0.58Mn)<\/strong><\/td><td class=\"column-6\">95<\/td>\n<\/tr>\n<tr class=\"row-45\">\n\t<td class=\"column-1\">38<\/td><td class=\"column-2\">Civil<\/td><td class=\"column-3\">Multimedia Projectors 2 Nos. And sound system for Drawing Office 2 (DO II)<\/td><td class=\"column-4\">1.8<\/td><td class=\"column-5\"><strong>E78 Batch (1.5Mn)<\/strong><\/td><td class=\"column-6\">100<\/td>\n<\/tr>\n<tr class=\"row-46\">\n\t<td class=\"column-1\">39<\/td><td class=\"column-2\">Common<\/td><td class=\"column-3\">Construction of steel staircase at AR office to upper floor<\/td><td class=\"column-4\">2.0<\/td><td class=\"column-5\"><strong>E93 Batch<\/strong><\/td><td class=\"column-6\">100<\/td>\n<\/tr>\n<tr class=\"row-47\">\n\t<td class=\"column-1\">40<\/td><td class=\"column-2\">Common<\/td><td class=\"column-3\">Supply and 5500 Lumens Multimedia projector and accessories for zoom meeting facilities<\/td><td class=\"column-4\">0.8<\/td><td class=\"column-5\"><strong>E66 Batch<\/strong><\/td><td class=\"column-6\"><\/td>\n<\/tr>\n<tr class=\"row-48\">\n\t<td class=\"column-1\">41<\/td><td class=\"column-2\">Common<\/td><td class=\"column-3\">Whether station to measure Air Quality<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><strong>Dr. Larif Zabuir of E82 Batch<\/strong><\/td><td class=\"column-6\">100<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<!-- #tablepress-1 from cache -->[\/vc_column][vc_column width=&#8221;1\/12&#8243;][\/vc_column][\/vc_row][vc_row][vc_column]<div class=\"edukul-divider divider-center divider-solid\" style=\"\"><\/div><div class=\"clearfix\"><\/div>\r\n\t<div class=\"edukul-spacer clearfix\" data-desktop=\"150\" data-mobi=\"100\" data-smobi=\"20\"><\/div><div class=\"edukul-headings clearfix text-center\"  style=\"\"><h2 class=\"heading clearfix \" style=\"color:#ffffff;\">\r\n\t\tPEFAA PROJECT IMPLEMENTATION PROCEDURE\r\n\t<\/h2><p class=\"sub-heading clearfix\" style=\"font-style:normal;color:#eeee22;\">\r\n\t\tPEFAA proposes two PROJECT implementation modes which are detailed in the below tabs as options 1 and 2.\r\n\t<\/p><\/div>\r\n\t<div class=\"edukul-spacer clearfix\" data-desktop=\"30\" data-mobi=\"20\" data-smobi=\"20\"><\/div>[vc_column_text]<\/p>\n<p style=\"text-align: center;\"><em><strong>Note : Two fresh Engineering graduates will be hired for a duration of six months to assist the PEFAA and departments.<\/strong><\/em><\/p>\n<p>[\/vc_column_text]\r\n\t<div class=\"edukul-spacer clearfix\" data-desktop=\"50\" data-mobi=\"50\" data-smobi=\"20\"><\/div>[vc_tta_tabs][vc_tta_section i_icon_fontawesome=&#8221;fas fa-hand-pointer&#8221; add_icon=&#8221;true&#8221; title=&#8221;OPTION 1&#8243; tab_id=&#8221;1717141532659-0dc21a83-08f0&#8243;][vc_message message_box_style=&#8221;solid&#8221; style=&#8221;round&#8221; message_box_color=&#8221;pink&#8221;]<strong>When donor wishes the PEFAA and relevant department implement and provide the progress to the donor monthly and on completion<\/strong>[\/vc_message]\n<table id=\"tablepress-7\" class=\"tablepress tablepress-id-7\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\">Steps<\/th><th class=\"column-2\">Description of Activity<\/th><th class=\"column-3\">Responsibility<\/th><th class=\"column-4\">Authorised by<\/th>\n<\/tr>\n<\/thead>\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-2\">\n\t<td class=\"column-1\">1<\/td><td class=\"column-2\">Project Proposal Submission ( Scope \/ Benefits \/ Cost)<\/td><td class=\"column-3\">Project Owner (Academic Staff Member)<\/td><td class=\"column-4\">Head of Department<\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">2<\/td><td class=\"column-2\">Project acceptance to coordinate by PEFAA<\/td><td class=\"column-3\">PEFAA Project Sub committee<\/td><td class=\"column-4\">President PEFAA \/ Dean<\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">3<\/td><td class=\"column-2\">Project Publish at PEFAA web site \/ Whatsapp Group <br \/>\n\/ E mail list<\/td><td class=\"column-3\">Web Master \/ Secretary \/ Editor<\/td><td class=\"column-4\">President PEFAA<\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\">4<\/td><td class=\"column-2\">Propaganda Activity to find a Host for funding projects<\/td><td class=\"column-3\">PEFAA EXCO \/ Batch Reps<\/td><td class=\"column-4\"><\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\">5<\/td><td class=\"column-2\">Appoint Project host ( Alumni \/ Sponsor \/ well-wishers )<\/td><td class=\"column-3\">PEFAA Project Sub committee<\/td><td class=\"column-4\">President PEFAA<\/td>\n<\/tr>\n<tr class=\"row-7\">\n\t<td class=\"column-1\">6<\/td><td class=\"column-2\">Fund Receiving to PEFAA Project Account<\/td><td class=\"column-3\">Host \/PEFAA Treasurer<\/td><td class=\"column-4\">President PEFAA<\/td>\n<\/tr>\n<tr class=\"row-8\">\n\t<td class=\"column-1\">7<\/td><td class=\"column-2\">Prepare BOQ and Call valid Quotations and selection of Contractor<\/td><td class=\"column-3\">Project Owner<\/td><td class=\"column-4\">Dean \/ President PEFAA<\/td>\n<\/tr>\n<tr class=\"row-9\">\n\t<td class=\"column-1\">8<\/td><td class=\"column-2\">Project awarding and Project Implementation<\/td><td class=\"column-3\">Project Owner \/ Contractor<\/td><td class=\"column-4\">Head of Department<\/td>\n<\/tr>\n<tr class=\"row-10\">\n\t<td class=\"column-1\">9<\/td><td class=\"column-2\">Quality Control and Quality Assurance of the project<\/td><td class=\"column-3\">QA Engineer \/ EXCO<\/td><td class=\"column-4\">President PEFAA<\/td>\n<\/tr>\n<tr class=\"row-11\">\n\t<td class=\"column-1\">10<\/td><td class=\"column-2\">Payment document submission (Advance Payment \/ Interim Payment \/ Final payment)<\/td><td class=\"column-3\">Project Owner<\/td><td class=\"column-4\">Dean \/ President PEFAA<\/td>\n<\/tr>\n<tr class=\"row-12\">\n\t<td class=\"column-1\">11<\/td><td class=\"column-2\">Releasing Payment<\/td><td class=\"column-3\">Treasurer ,and Secretary  of PEFAA<\/td><td class=\"column-4\">President PEFAA\/ Dean<\/td>\n<\/tr>\n<tr class=\"row-13\">\n\t<td class=\"column-1\">12<\/td><td class=\"column-2\">Making Completion Report<\/td><td class=\"column-3\">Project Owner<\/td><td class=\"column-4\">President PEFAA \/ Dean<\/td>\n<\/tr>\n<tr class=\"row-14\">\n\t<td class=\"column-1\">13<\/td><td class=\"column-2\">Publishing results at Website \/ Whatsapp  \/ E mail<\/td><td class=\"column-3\">Web Master \/ Secretary \/ Editor<\/td><td class=\"column-4\">President PEFAA<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<!-- #tablepress-7 from cache -->[\/vc_tta_section][vc_tta_section i_icon_fontawesome=&#8221;far fa-hand-pointer&#8221; add_icon=&#8221;true&#8221; title=&#8221;OPTION 2&#8243; tab_id=&#8221;1717141532677-e7119bee-e4e2&#8243;][vc_message message_box_style=&#8221;solid&#8221; style=&#8221;round&#8221; message_box_color=&#8221;green&#8221;]<strong>When donor wishes to implement directly with the relevant department and PEFAA to monitor the progress monthly and on completion.<\/strong>[\/vc_message]\n<table id=\"tablepress-8\" class=\"tablepress tablepress-id-8\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\">Steps<\/th><th class=\"column-2\">Description of Activity<\/th><th class=\"column-3\">Responsibility<\/th><th class=\"column-4\">Authorised by<\/th>\n<\/tr>\n<\/thead>\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-2\">\n\t<td class=\"column-1\">1<\/td><td class=\"column-2\">Project Proposal Submission ( Scope \/ Benefits \/ Cost)<\/td><td class=\"column-3\">Project Owner (Academic department)<\/td><td class=\"column-4\">Head of Department<\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">2<\/td><td class=\"column-2\">Project acceptance to coordinate by PEFAA<\/td><td class=\"column-3\">PEFAA Project Sub committee<\/td><td class=\"column-4\">President PEFAA \/ Dean<\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">3<\/td><td class=\"column-2\">Project Publish at PEFAA web site \/ Whatsapp Group <br \/>\n\/ E mail list<\/td><td class=\"column-3\">Web Master \/ Secretary \/ Editor<\/td><td class=\"column-4\">PEFAA Ex-Co<\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\">4<\/td><td class=\"column-2\">Propaganda Activity to find a Donor for funding projects<\/td><td class=\"column-3\">PEFAA EXCO \/ Batch Reps<\/td><td class=\"column-4\">PEFAA Ex-Co<\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\">5<\/td><td class=\"column-2\">Appoint Project host ( Alumni \/ Sponsor \/ well-wishers )<\/td><td class=\"column-3\">PEFAA Project Sub committee<\/td><td class=\"column-4\">PEFAA Ex-Co<\/td>\n<\/tr>\n<tr class=\"row-7\">\n\t<td class=\"column-1\">6<\/td><td class=\"column-2\">Funds managed by the Respective Donor<\/td><td class=\"column-3\">Donor \/Relevant Department<\/td><td class=\"column-4\">HoD \/ Donor<\/td>\n<\/tr>\n<tr class=\"row-8\">\n\t<td class=\"column-1\">7<\/td><td class=\"column-2\">Prepare BOQ and Call valid Quotations and selection of Contractor<\/td><td class=\"column-3\">a) Project Owner \/ Focal Point \/ Dept TAs                                                           b) As per Dean's Advice                                       c) QA and QC Engineer deployed by PEFAA<\/td><td class=\"column-4\">HoD \/ Donor<\/td>\n<\/tr>\n<tr class=\"row-9\">\n\t<td class=\"column-1\">7A<\/td><td class=\"column-2\">Donor Concurrence<\/td><td class=\"column-3\">HoD\/ Donor<\/td><td class=\"column-4\">HoD<\/td>\n<\/tr>\n<tr class=\"row-10\">\n\t<td class=\"column-1\">8<\/td><td class=\"column-2\">Project awarding and Project Implementation<\/td><td class=\"column-3\">Respective Dept \/ Donor \/ Contractor<\/td><td class=\"column-4\">HoD \/ Donor<\/td>\n<\/tr>\n<tr class=\"row-11\">\n\t<td class=\"column-1\">9<\/td><td class=\"column-2\">Faculty Uplifting Quality Control and Quality Assurance<\/td><td class=\"column-3\">QA Engineer \/ Ex-co \/ A Snr Lecturer of the Faculty<\/td><td class=\"column-4\">HoD \/ Donor<\/td>\n<\/tr>\n<tr class=\"row-12\">\n\t<td class=\"column-1\">10<\/td><td class=\"column-2\">Payment document submission (Advance Payment \/ Interim Payment \/ Final payment)<\/td><td class=\"column-3\">Project Owner<\/td><td class=\"column-4\">HoD  \/ Donor<\/td>\n<\/tr>\n<tr class=\"row-13\">\n\t<td class=\"column-1\">11<\/td><td class=\"column-2\">Releasing Payment<\/td><td class=\"column-3\">Donor \/Relevant Department<\/td><td class=\"column-4\">Dean \/ Donor<\/td>\n<\/tr>\n<tr class=\"row-14\">\n\t<td class=\"column-1\">12<\/td><td class=\"column-2\">Preparing Completion Report<\/td><td class=\"column-3\">Project Owner \/ HoD<\/td><td class=\"column-4\">Donor \/ Dean<\/td>\n<\/tr>\n<tr class=\"row-15\">\n\t<td class=\"column-1\">13<\/td><td class=\"column-2\">Publishing results at Website \/ Whatsapp  \/ E mail<\/td><td class=\"column-3\">Web Master \/ Secretary \/ Editor<\/td><td class=\"column-4\">President PEFAA<\/td>\n<\/tr>\n<tr class=\"row-16\">\n\t<td class=\"column-1\">14<\/td><td class=\"column-2\">Preparation of Inventory &amp; include to the Faculty Inventory<\/td><td class=\"column-3\">Project Owner<\/td><td class=\"column-4\">HoD  \/ PEFAA Exco<\/td>\n<\/tr>\n<tr class=\"row-17\">\n\t<td class=\"column-1\">15<\/td><td class=\"column-2\">Maintenance Budget<\/td><td class=\"column-3\">Project Owner<\/td><td class=\"column-4\">HoD \/ Dean<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<!-- #tablepress-8 from cache -->[\/vc_tta_section][\/vc_tta_tabs][\/vc_column][\/vc_row][vc_row][vc_column]\r\n\t<div class=\"edukul-spacer clearfix\" data-desktop=\"50\" data-mobi=\"50\" data-smobi=\"20\"><\/div>[vc_single_image image=&#8221;19655&#8243; img_size=&#8221;1400&#215;1000&#8243; alignment=&#8221;center&#8221; style=&#8221;vc_box_rounded&#8221; onclick=&#8221;img_link_large&#8221;]\r\n\t<div class=\"edukul-spacer clearfix\" data-desktop=\"20\" data-mobi=\"10\" data-smobi=\"10\"><\/div>[vc_single_image image=&#8221;19656&#8243; img_size=&#8221;1400&#215;1000&#8243; alignment=&#8221;center&#8221; style=&#8221;vc_box_rounded&#8221; onclick=&#8221;img_link_large&#8221;]\r\n\t<div class=\"edukul-spacer clearfix\" data-desktop=\"20\" data-mobi=\"10\" data-smobi=\"10\"><\/div>[vc_cta h2=&#8221;Tri-fold Brochure&#8221; shape=&#8221;round&#8221; color=&#8221;juicy-pink&#8221; el_width=&#8221;xs&#8221; add_button=&#8221;right&#8221; btn_title=&#8221;Download&#8221; btn_style=&#8221;classic&#8221; btn_shape=&#8221;round&#8221; css=&#8221;.vc_custom_1719110964985{background-color: #000000 !important;}&#8221; btn_link=&#8221;url:https%3A%2F%2Fpefaa.eng.pdn.ac.lk%2Fwp-content%2Fuploads%2F2024%2F06%2FPEFAA_DJ-Projects2024.pdf|target:_blank&#8221;][\/vc_cta][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][\/vc_column][\/vc_row][vc_section][vc_row][vc_column width=&#8221;1\/12&#8243;][\/vc_column][vc_column width=&#8221;5\/6&#8243;][vc_column_text] Message from the Dean, Faculty of Engineering Request to support PEFAA initiatives to carry out a face-lifting of infrastructure at the Faculty to Celebrate Diamond Jubilee of the Faculty of Engineering, Peradeniya. [\/vc_column_text][vc_column_text css=&#8221;.vc_custom_1720514651370{margin-right: 50px !important;margin-left: 50px !important;background-color: #ddaaaa !important;border-radius: 35px !important;}&#8221;] As you are aware, the<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-19144","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/pefaa.eng.pdn.ac.lk\/index.php\/wp-json\/wp\/v2\/pages\/19144","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pefaa.eng.pdn.ac.lk\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/pefaa.eng.pdn.ac.lk\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/pefaa.eng.pdn.ac.lk\/index.php\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/pefaa.eng.pdn.ac.lk\/index.php\/wp-json\/wp\/v2\/comments?post=19144"}],"version-history":[{"count":137,"href":"https:\/\/pefaa.eng.pdn.ac.lk\/index.php\/wp-json\/wp\/v2\/pages\/19144\/revisions"}],"predecessor-version":[{"id":20017,"href":"https:\/\/pefaa.eng.pdn.ac.lk\/index.php\/wp-json\/wp\/v2\/pages\/19144\/revisions\/20017"}],"wp:attachment":[{"href":"https:\/\/pefaa.eng.pdn.ac.lk\/index.php\/wp-json\/wp\/v2\/media?parent=19144"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}